{"id":11967,"date":"2026-07-27T17:10:58","date_gmt":"2026-07-27T15:10:58","guid":{"rendered":"https:\/\/solartradex.com\/blog\/?p=11967"},"modified":"2026-08-04T06:24:23","modified_gmt":"2026-08-04T04:24:23","slug":"factor-insularitat-2026-2027-balears-analisi-programes","status":"publish","type":"post","link":"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/","title":{"rendered":"Convocat\u00f2ria Factor Insularitat 2026-2027 a les Illes Balears: an\u00e0lisi dels quatre programes i sin\u00e8rgies fiscals."},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Contenidos<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Lexcepcio_balear_per_que_existeix_un_marc_dajuts_especific\" >L&#8217;excepci\u00f3 balear: per qu\u00e8 existeix un marc d&#8217;ajuts espec\u00edfic<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Lapagada_peninsular_de_2025_i_per_que_Balears_no_es_va_apagar\" >L&#8217;apagada peninsular de 2025 i per qu\u00e8 Balears no es va apagar<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Factor_Insularitat_2026-2027_FOTOPAR_i_PITEIB_que_es_cada_cosa_i_per_que_es_confonen\" >Factor Insularitat 2026-2027, FOTOPAR i PITEIB: qu\u00e8 \u00e9s cada cosa i per qu\u00e8 es confonen<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Els_quatre_programes_de_la_Convocatoria_Factor_Insularitat\" >Els quatre programes de la Convocat\u00f2ria Factor Insularitat<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Qui_pot_demanar_que_el_repartiment_per_perfil_de_beneficiari\" >Qui pot demanar qu\u00e8: el repartiment per perfil de beneficiari<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Intensitats_dajut_i_costos_maxims_subvencionables\" >Intensitats d&#8217;ajut i costos m\u00e0xims subvencionables<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Compatibilitats_amb_altres_instruments_fiscals\" >Compatibilitats amb altres instruments fiscals<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Terminis_proces_i_regles_operatives\" >Terminis, proc\u00e9s i regles operatives<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Preguntes_frequents_sobre_la_tramitacio\" >Preguntes freq\u00fcents sobre la tramitaci\u00f3<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Com_a_particular_puc_demanar_Factor_Insularitat_per_installar_plaques_solars_a_casa\" >Com a particular, puc demanar Factor Insularitat per instal\u00b7lar plaques solars a casa?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Puc_presentar_un_projecte_conjunt_de_fotovoltaica_bateria_sent_particular\" >Puc presentar un projecte conjunt de fotovoltaica + bateria sent particular?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Puc_comencar_lobra_abans_de_tenir_la_resolucio_concedida\" >Puc comen\u00e7ar l&#8217;obra abans de tenir la resoluci\u00f3 concedida?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Quant_dajut_rebo_si_tinc_una_empresa_i_maculli_a_minimis\" >Quant d&#8217;ajut rebo si tinc una empresa i m&#8217;aculli a minimis?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Les_grans_empreses_poden_acollir-se_al_minimis\" >Les grans empreses poden acollir-se al minimis?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Puc_installar_un_carregador_de_vehicle_electric_de_22_kW_i_acollir-me_a_lajut\" >Puc instal\u00b7lar un carregador de vehicle el\u00e8ctric de 22 kW i acollir-me a l&#8217;ajut?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Existeix_una_ratio_maxima_entre_la_capacitat_de_bateria_i_la_potencia_de_la_installacio_fotovoltaica\" >Existeix una r\u00e0tio m\u00e0xima entre la capacitat de bateria i la pot\u00e8ncia de la instal\u00b7laci\u00f3 fotovoltaica?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Que_passa_si_sesgoten_els_fons_de_2026_abans_de_resoldre_el_meu_expedient\" >Qu\u00e8 passa si s&#8217;esgoten els fons de 2026 abans de resoldre el meu expedient?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Puc_combinar_Factor_Insularitat_amb_la_deduccio_de_lIRPF_sobre_la_mateixa_obra\" >Puc combinar Factor Insularitat amb la deducci\u00f3 de l&#8217;IRPF sobre la mateixa obra?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Com_a_empresa_em_conve_combinar_Factor_amb_la_llibertat_damortitzacio_de_lImpost_sobre_Societats\" >Com a empresa, em conv\u00e9 combinar Factor amb la llibertat d&#8217;amortitzaci\u00f3 de l&#8217;Impost sobre Societats?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Les_bonificacions_municipals_Calvia_Palma_es_demanen_amb_Factor_Insularitat\" >Les bonificacions municipals (Calvi\u00e0, Palma) es demanen amb Factor Insularitat?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/solartradex.com\/blog\/ca\/factor-insularitat-2026-2027-balears-analisi-programes\/#Consideracio_final\" >Consideraci\u00f3 final<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Lexcepcio_balear_per_que_existeix_un_marc_dajuts_especific\"><\/span>L&#8217;excepci\u00f3 balear: per qu\u00e8 existeix un marc d&#8217;ajuts espec\u00edfic<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A SolarTradex, amb oficina a Palma, sabem que les Illes Balears operen sota condicions energ\u00e8tiques diferents de la resta de l&#8217;Estat. La insularitat no \u00e9s una etiqueta administrativa: \u00e9s una realitat f\u00edsica que es tradueix en cables submarins amb capacitat limitada, cicles combinats de gas cobrint la punta de demanda a l&#8217;estiu, preus majoristes hist\u00f2ricament per sobre de la mitjana peninsular, i una vulnerabilitat estructural davant de qualsevol tensi\u00f3 geopol\u00edtica que afecti el subministrament de combustibles f\u00f2ssils importats.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aquesta condici\u00f3 justifica l&#8217;exist\u00e8ncia d&#8217;un ecosistema d&#8217;ajuts espec\u00edficament dissenyat per accelerar la transici\u00f3 energ\u00e8tica de l&#8217;arxip\u00e8lag. El 2026-2027 hi conviuen diversos instruments amb or\u00edgens i destinataris diferents: la <strong>Convocat\u00f2ria Factor Insularitat 2026-2027<\/strong> finan\u00e7ada amb fons auton\u00f2mics propis, la l\u00ednia <strong>FOTOPAR<\/strong> per a autoconsum residencial (actualment amb fons esgotats), el marc <strong>PITEIB<\/strong> lligat a Next Generation EU, i els ajuts de l&#8217;<strong>Impost del Turisme Sostenible<\/strong> per al sector allotjatiu. Entendre quin instrument s&#8217;aplica a cada perfil i en quin estat es troba cada convocat\u00f2ria \u00e9s la primera condici\u00f3 per no perdre temps ni oportunitats.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Lapagada_peninsular_de_2025_i_per_que_Balears_no_es_va_apagar\"><\/span>L&#8217;apagada peninsular de 2025 i per qu\u00e8 Balears no es va apagar<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Per entendre per qu\u00e8 el marc actual prioritza tan agressivament l&#8217;emmagatzematge energ\u00e8tic, conv\u00e9 recordar qu\u00e8 va passar el dilluns 28 d&#8217;abril de 2025 a les 12:33 hores. En un interval d&#8217;amb prou feines cinc segons, el sistema el\u00e8ctric peninsular va perdre 15.000 MW de pot\u00e8ncia \u2014el 60% de la producci\u00f3 nacional\u2014 per una cadena de sobretensions i oscil\u00b7lacions de freq\u00fc\u00e8ncia que Red El\u00e9ctrica no va poder contenir. El resultat va ser una apagada sist\u00e8mica que va deixar sense subministrament 50 milions de persones a Espanya, Portugal i Andorra.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les Illes Balears, tanmateix, no es van apagar. En el segon exacte del col\u00b7lapse, l&#8217;interconnector pen\u00ednsula-Mallorca (l&#8217;enlla\u00e7 Comanxe) es va desconnectar autom\u00e0ticament per protocol de seguretat. Balears \u2014el mix del qual cobreix aproximadament el 93% de la demanda amb generaci\u00f3 pr\u00f2pia\u2014 va absorbir la c\u00e0rrega amb les centrals d&#8217;Es Murterar (Mallorca), Cas Tresorer i Son Reus (Palma), estabilitzant la freq\u00fc\u00e8ncia de la xarxa insular. Mallorca, Menorca, Eivissa i Formentera van operar com un sistema tancat i estable durant tota la crisi peninsular.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Per\u00f2 va apar\u00e8ixer una vulnerabilitat cr\u00edtica sis hores despr\u00e9s: a les 18:06h del mateix dilluns, amb el subministrament el\u00e8ctric plenament operatiu a l&#8217;arxip\u00e8lag, la xarxa de fibra \u00f2ptica va caure per esgotament dels SAI\/UPS dels nusos peninsulars. La telefonia m\u00f2bil va patir fallades intermitents fins a les 07:00 del dimarts; els dat\u00e0fons i la banca electr\u00f2nica no es van recuperar fins al dimecres; el servei d&#8217;emerg\u00e8ncies 061 va quedar inoperatiu. El Govern va activar el Pla Territorial d&#8217;Emerg\u00e8ncies PLATERBAL a nivell 1.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La lli\u00e7\u00f3 estrat\u00e8gica que van treure les administracions balears va ser clara: la sobirania el\u00e8ctrica no \u00e9s suficient si els nusos cr\u00edtics depenen de sistemes de suport amb autonomies d&#8217;hores. Aquesta an\u00e0lisi va ser el catalitzador directe de l&#8217;actual aposta auton\u00f2mica per l&#8217;<strong>emmagatzematge distribu\u00eft<\/strong>, materialitzada en el pes espec\u00edfic que les bateries tenen a la Convocat\u00f2ria Factor Insularitat 2026-2027.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Factor_Insularitat_2026-2027_FOTOPAR_i_PITEIB_que_es_cada_cosa_i_per_que_es_confonen\"><\/span>Factor Insularitat 2026-2027, FOTOPAR i PITEIB: qu\u00e8 \u00e9s cada cosa i per qu\u00e8 es confonen<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Un dels punts que m\u00e9s confusi\u00f3 genera a Balears \u00e9s la coexist\u00e8ncia de diversos instruments d&#8217;ajut que a vegades se citen indistintament. Conv\u00e9 delimitar-los clarament perqu\u00e8 tenen or\u00edgens, destinataris i estats diferents:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Convocat\u00f2ria Factor Insularitat 2026-2027.<\/strong> \u00c9s la convocat\u00f2ria auton\u00f2mica actualment oberta, publicada mitjan\u00e7ant Resoluci\u00f3 al BOIB n\u00fam. 83 de 2 de juliol de 2026 i amb termini de presentaci\u00f3 des del 9 de juliol de 2026 fins al 28 de febrer de 2027 (o fins a l&#8217;esgotament del pressupost). Est\u00e0 finan\u00e7ada amb fons auton\u00f2mics propis del r\u00e8gim de compensaci\u00f3 per insularitat, no amb fons europeus Next Generation. Cobreix quatre programes diferents que analitzem m\u00e9s avall.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>FOTOPAR.<\/strong> \u00c9s una convocat\u00f2ria auton\u00f2mica diferent i independent, cofinan\u00e7ada per fons FEDER i regulada a l&#8217;empara del Reial Decret 477\/2021, orientada espec\u00edficament a l&#8217;autoconsum fotovoltaic residencial (persones f\u00edsiques). En aquest moment es troba amb <strong>fons esgotats<\/strong> i no admet noves sol\u00b7licituds. \u00c9s la l\u00ednia que tradicionalment molts particulars recorden pel nom perqu\u00e8 ha estat durant anys el vehicle natural per als ajuts residencials de plaques solars a Balears.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>PITEIB (Pla d&#8217;Inversions per a la Transici\u00f3 Energ\u00e8tica de les Illes Balears).<\/strong> \u00c9s un pla estrat\u00e8gic m\u00e9s ampli del Govern balear, canalitzat principalment amb fons Next Generation EU. No \u00e9s una convocat\u00f2ria d&#8217;ajuts en si mateix, sin\u00f3 un marc que agrupa diverses l\u00ednies de finan\u00e7ament orientades a la transici\u00f3 energ\u00e8tica. Conviu amb Factor Insularitat per\u00f2 no la inclou ni la substitueix.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Ajuts de l&#8217;Impost del Turisme Sostenible (ITS).<\/strong> Finan\u00e7ats amb la recaptaci\u00f3 de l&#8217;ITS, estan dirigits espec\u00edficament al sector allotjatiu balear amb una dotaci\u00f3 de 5.000.000 d&#8217;euros el 2026 (3M\u20ac per a efici\u00e8ncia i 2M\u20ac per a innovaci\u00f3). No cobreixen instal\u00b7lacions fotovoltaiques ni e\u00f2liques, per la qual cosa un hotel que vulgui abordar de forma integral la seva descarbonitzaci\u00f3 ha de combinar ITS amb Factor Insularitat, respectant la regla de no doble finan\u00e7ament.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En aquest article ens centrem en la Convocat\u00f2ria Factor Insularitat 2026-2027, per ser la l\u00ednia vigent ara mateix amb major abast i versatilitat.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Els_quatre_programes_de_la_Convocatoria_Factor_Insularitat\"><\/span>Els quatre programes de la Convocat\u00f2ria Factor Insularitat<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La convocat\u00f2ria s&#8217;estructura en quatre programes independents que es poden sol\u00b7licitar per separat o de forma conjunta en una mateixa sol\u00b7licitud:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Programa 1 \u00b7 Autoconsum el\u00e8ctric (fotovoltaic).<\/strong> Cobreix instal\u00b7lacions fotovoltaiques d&#8217;autoconsum fins a 500 kWp. <strong>Aquest programa NO admet persones f\u00edsiques sense activitat econ\u00f2mica com a benefici\u00e0ries.<\/strong> \u00c9s el punt diferencial m\u00e9s important per al segment residencial, i el desenvolupem a l&#8217;apartat seg\u00fcent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Programa 2 \u00b7 Generaci\u00f3 t\u00e8rmica renovable.<\/strong> Cobreix instal\u00b7lacions d&#8217;aerot\u00e8rmia. <strong>Exclou expressament la tecnologia aire-aire<\/strong> per a tots els sectors (residencial, terciari i industrial). Cobreix la generaci\u00f3 t\u00e8rmica en \u20ac\/kWt i tamb\u00e9 els nous sistemes de distribuci\u00f3 associats.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Programa 3 \u00b7 Emmagatzematge el\u00e8ctric per a autoconsum.<\/strong> Cobreix bateries d&#8217;acumulaci\u00f3 associades a l&#8217;autoconsum, fins a 200 kWh de capacitat. Un detall rellevant confirmat a les FAQ oficials: en aquesta convocat\u00f2ria <strong>no s&#8217;aplica r\u00e0tio m\u00e0xim kWh\/kWp<\/strong> entre la capacitat de la bateria i la pot\u00e8ncia de generaci\u00f3 associada. I un altre detall clau per a particulars: encara que estiguin exclosos del Programa 1 (fotovoltaica), s\u00ed que poden accedir al Programa 3 (bateries) presentant la sol\u00b7licitud amb les partides corresponents desglossades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Programa 4 \u00b7 Infraestructura de rec\u00e0rrega privada de vehicle el\u00e8ctric.<\/strong> Cobreix nous punts de rec\u00e0rrega privats fins a 15 kW. Els equips trif\u00e0sics habituals de 22 kW poden ser elegibles si es configuren, limiten i instal\u00b7len efectivament a 15 kW o menys, amb la limitaci\u00f3 reflectida en les proteccions i en la mem\u00f2ria t\u00e8cnica.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Qui_pot_demanar_que_el_repartiment_per_perfil_de_beneficiari\"><\/span>Qui pot demanar qu\u00e8: el repartiment per perfil de beneficiari<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Aquest \u00e9s el punt que m\u00e9s malentesos genera a les consultes comercials. La convocat\u00f2ria distingeix clarament entre perfils, i no tots poden accedir a tots els programes:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Persones f\u00edsiques SENSE activitat econ\u00f2mica (residents a Illes Balears):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Programa 1 (fotovoltaica): <strong>NO elegibles.<\/strong><\/li>\n\n\n\n<li>Programa 2 (aerot\u00e8rmia): s\u00ed, ajut del 70%.<\/li>\n\n\n\n<li>Programa 3 (bateries): s\u00ed, ajut del 45%.<\/li>\n\n\n\n<li>Programa 4 (punt de rec\u00e0rrega): s\u00ed, ajut del 70% amb l\u00edmit de 2.500 \u20ac per instal\u00b7laci\u00f3.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Un particular que vulgui instal\u00b7lar plaques solars al seu habitatge <strong>no pot sol\u00b7licitar la Convocat\u00f2ria Factor Insularitat per a la part fotovoltaica<\/strong>. En un primer moment aix\u00f2 pot semblar un obstacle important, per\u00f2 a la pr\u00e0ctica no ho \u00e9s tant: la <a href=\"https:\/\/solartradex.com\/blog\/ca\/deduccions-i-incentius-per-a-la-transicio-energetica-irpf-rdl-7-2026\/\">deducci\u00f3 estatal de l&#8217;IRPF derivada del RDL 7\/2026<\/a> permet recuperar una part molt significativa de la inversi\u00f3, especialment quan es combina fotovoltaica amb electrificaci\u00f3 t\u00e8rmica (aerot\u00e8rmia), on el tram alt del 60% en habitatge unifamiliar fa que el retorn fiscal net sigui pr\u00e0cticament equivalent al que s&#8217;obtindria combinant subvenci\u00f3 m\u00e9s IRPF residual. A m\u00e9s, si el particular combina FV amb bateria, la part de la bateria s\u00ed que es pot acollir al Programa 3 de Factor Insularitat amb les partides desglossades en la sol\u00b7licitud, i la part del punt de rec\u00e0rrega al Programa 4 si tamb\u00e9 s&#8217;hi inclou. A la pr\u00e0ctica, el particular balear disposa d&#8217;un ventall d&#8217;instruments que, combinats correctament, cobreixen bona part de la inversi\u00f3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Persones f\u00edsiques AMB activitat econ\u00f2mica (aut\u00f2noms):<\/strong> s\u00f3n elegibles en els quatre programes, amb les intensitats corresponents al r\u00e8gim que apliquin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Empreses i entitats (pimes, grans empreses, comunitats de propietaris, comunitats energ\u00e8tiques, entitats sense \u00e0nim de lucre, administracions locals):<\/strong> elegibles en els quatre programes, amb intensitat variable segons r\u00e8gim (Minimis o Reglament General d&#8217;Exempci\u00f3 per Categories) i mida.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a71e5fc8bfe1&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a71e5fc8bfe1\" class=\"wp-block-image size-large wp-lightbox-container\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"537\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_matriz_perfil_programa_CAT-1024x537.png\" alt=\"Matriu d&#039;acc\u00e9s al programa Factor Insularitat 2026-2027 a Balears segons perfil de beneficiari: particular sense activitat, aut\u00f2nom, petita, mitjana i gran empresa, als quatre programes\" class=\"wp-image-11972\" title=\"\" srcset=\"https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_matriz_perfil_programa_CAT-1024x537.png 1024w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_matriz_perfil_programa_CAT-768x403.png 768w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_matriz_perfil_programa_CAT-300x157.png 300w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_matriz_perfil_programa_CAT-1536x806.png 1536w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_matriz_perfil_programa_CAT.png 1875w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Intensitats_dajut_i_costos_maxims_subvencionables\"><\/span>Intensitats d&#8217;ajut i costos m\u00e0xims subvencionables<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Les intensitats varien segons el r\u00e8gim d&#8217;ajut al qual s&#8217;aculli el beneficiari. Tota empresa \u2014incloses les grans empreses, segons ha confirmat el Govern a les FAQ oficials\u2014 pot optar per acollir-se al r\u00e8gim de minimis, amb les intensitats m\u00e9s altes, sempre que no hagi esgotat el topall acumulat de 300.000 euros en tres exercicis fiscals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Intensitats per r\u00e8gim i mida de beneficiari:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Actuaci\u00f3<\/th><th>Minimis \/ Particular sense activitat<\/th><th>Petita empresa (RGEC)<\/th><th>Mitjana empresa (RGEC)<\/th><th>Gran empresa (RGEC)<\/th><\/tr><\/thead><tbody><tr><td>Fotovoltaica (P1)<\/td><td>70%<\/td><td>60%<\/td><td>50%<\/td><td>40%<\/td><\/tr><tr><td>Aerot\u00e8rmia (P2)<\/td><td>70%<\/td><td>60%<\/td><td>50%<\/td><td>40%<\/td><\/tr><tr><td>Bateries (P3)<\/td><td>45%<\/td><td>40%<\/td><td>35%<\/td><td>30%<\/td><\/tr><tr><td>Punt de rec\u00e0rrega (P4)<\/td><td>70%<\/td><td>40%<\/td><td>30%<\/td><td>20%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Aquestes intensitats no s&#8217;apliquen sobre el cost real de la instal\u00b7laci\u00f3, sin\u00f3 sobre el <strong>cost subvencionable<\/strong> que fixa la convocat\u00f2ria en funci\u00f3 de la tecnologia i el tram. En cada cas, es pren el menor valor entre el cost real i el cost m\u00e0xim subvencionable, i sobre aquest menor s&#8217;aplica el percentatge.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a71e5fc8cb4b&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a71e5fc8cb4b\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" width=\"1024\" height=\"537\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_costes_maximos_CAT-1024x537.png\" alt=\"Costos m\u00e0xims subvencionables del Programa Factor Insularitat 2026-2027 a Balears: fotovoltaica per trams de pot\u00e8ncia, aerot\u00e8rmia, bateries i punt de rec\u00e0rrega\" class=\"wp-image-11975\" title=\"\" srcset=\"https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_costes_maximos_CAT-1024x537.png 1024w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_costes_maximos_CAT-768x403.png 768w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_costes_maximos_CAT-300x157.png 300w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_costes_maximos_CAT-1536x806.png 1536w, https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/08\/Blog_Balears_costes_maximos_CAT.png 1875w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Costos m\u00e0xims subvencionables \u00b7 Fotovoltaica (Programa 1):<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Tram de pot\u00e8ncia<\/th><th>Cost m\u00e0x. generaci\u00f3<\/th><th>Complement marquesina<\/th><th>Complement retirada amiant<\/th><th>Complement canvi tensi\u00f3<\/th><\/tr><\/thead><tbody><tr><td>P \u2264 10 kWp<\/td><td>1.188 \u20ac\/kWp<\/td><td>500 \u20ac\/kWp<\/td><td>1.082 \u20ac\/kWp<\/td><td>400 \u20ac\/kWp<\/td><\/tr><tr><td>10 &lt; P \u2264 100 kWp<\/td><td>910 \u20ac\/kWp<\/td><td>500 \u20ac\/kWp<\/td><td>817 \u20ac\/kWp<\/td><td>300 \u20ac\/kWp<\/td><\/tr><tr><td>100 &lt; P \u2264 500 kWp<\/td><td>749 \u20ac\/kWp<\/td><td>500 \u20ac\/kWp<\/td><td>720 \u20ac\/kWp<\/td><td>200 \u20ac\/kWp<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">El c\u00e0lcul del cost unitari m\u00e0xim de generaci\u00f3 es fa per trams acumulatius des de l&#8217;escal\u00f3 inferior. Els complements (marquesina, retirada d&#8217;amiant, canvi de tensi\u00f3) no apliquen efecte acumulatiu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Costos m\u00e0xims subvencionables \u00b7 Aerot\u00e8rmia (Programa 2):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cost unitari m\u00e0xim t\u00e8rmic: <strong>1.000 \u20ac\/kWt<\/strong><\/li>\n\n\n\n<li>Nous sistemes de distribuci\u00f3: <strong>450 \u20ac\/kWt<\/strong> addicionals<\/li>\n\n\n\n<li>L\u00edmit d&#8217;ajut per a persones f\u00edsiques i aut\u00f2noms: <strong>25.000 \u20ac<\/strong><\/li>\n\n\n\n<li>L\u00edmit d&#8217;ajut per a la resta de beneficiaris: <strong>100.000 \u20ac<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Costos m\u00e0xims subvencionables \u00b7 Bateries (Programa 3):<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Capacitat<\/th><th>Cost m\u00e0xim subvencionable<\/th><\/tr><\/thead><tbody><tr><td>\u2264 10 kWh<\/td><td>910 \u20ac\/kWh<\/td><\/tr><tr><td>10 &lt; capacitat \u2264 100 kWh<\/td><td>650 \u20ac\/kWh<\/td><\/tr><tr><td>100 &lt; capacitat \u2264 200 kWh<\/td><td>455 \u20ac\/kWh<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Costos m\u00e0xims subvencionables \u00b7 Punt de rec\u00e0rrega (Programa 4):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No existeix cost m\u00e0xim \u20ac\/kW.<\/li>\n\n\n\n<li>L\u00edmit d&#8217;ajut: <strong>12.000 \u20ac<\/strong> per instal\u00b7laci\u00f3 per a empreses i entitats.<\/li>\n\n\n\n<li>L\u00edmit d&#8217;ajut: <strong>2.500 \u20ac<\/strong> per instal\u00b7laci\u00f3 per a particulars sense activitat econ\u00f2mica.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Compatibilitats_amb_altres_instruments_fiscals\"><\/span>Compatibilitats amb altres instruments fiscals<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>&#x1f4cc; DISCLAIMER FISCAL BALEARS \u00b7 Actualitzaci\u00f3 pendent<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;articulaci\u00f3 espec\u00edfica entre la Convocat\u00f2ria Factor Insularitat, el tram auton\u00f2mic de l&#8217;IRPF balear i el r\u00e8gim estatal de deduccions del RDL 7\/2026 est\u00e0 pendent de confirmaci\u00f3 per part del nostre assessor fiscal. Aquest apartat descriu el marc general de compatibilitats vigent, per\u00f2 les quanties concretes i la interacci\u00f3 exacta entre instruments per al cas d&#8217;un resident a Balears s&#8217;han de verificar sempre amb un professional. Actualitzarem aquesta secci\u00f3 tan bon punt disposem de la confirmaci\u00f3 t\u00e8cnica.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">La Convocat\u00f2ria Factor Insularitat 2026-2027 \u00e9s compatible amb diversos instruments fiscals complementaris, sempre respectant la regla de no doble finan\u00e7ament sobre el mateix cost:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Deducci\u00f3 IRPF (RDL 7\/2026).<\/strong> Compatible amb Factor Insularitat. L&#8217;import subvencionat es descompta de la base dedu\u00efble a l&#8217;IRPF i a m\u00e9s tributa com a guany patrimonial. La deducci\u00f3 s&#8217;aplica exclusivament sobre la part de la despesa efectivament satisfeta pel contribuent, neta de la subvenci\u00f3 rebuda. Els trams aplicables i la possible interacci\u00f3 amb el tram auton\u00f2mic balear a l&#8217;IRPF s&#8217;han de consultar amb un assessor fiscal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Llibertat d&#8217;amortitzaci\u00f3 de l&#8217;Impost sobre Societats (RDL 7\/2026, art. 37).<\/strong> Compatible amb Factor Insularitat per a empreses. La subvenci\u00f3 redueix el cost inicial de la inversi\u00f3, i la llibertat d&#8217;amortitzaci\u00f3 avan\u00e7a el retorn fiscal sobre la part no subvencionada, permetent amortitzar el 100% de l&#8217;actiu en el mateix exercici d&#8217;entrada en funcionament.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Certificats d&#8217;Estalvi Energ\u00e8tic (CAE).<\/strong> Compatibles amb Factor Insularitat. Especialment rellevants per a la substituci\u00f3 de calderes f\u00f2ssils per aerot\u00e8rmia, on el RDL 7\/2026 refor\u00e7a els coeficients multiplicadors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bonificacions municipals en IBI i ICIO.<\/strong> Compatibles. A Calvi\u00e0, bonificaci\u00f3 del 50% en IBI i 95% en ICIO per a instal\u00b7lacions que integrin aprofitament renovable (sol\u00b7licitud de l&#8217;IBI entre agost i octubre de l&#8217;any anterior). A Palma, bonificacions de fins al 95% en ICIO per a instal\u00b7lacions no obligat\u00f2ries per llei. Cada ajuntament t\u00e9 la seva pr\u00f2pia ordenan\u00e7a i calendari.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Next Generation (estatals).<\/strong> Requereix verificaci\u00f3 en cada convocat\u00f2ria: \u00e9s freq\u00fcent la incompatibilitat sobre el mateix cost.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Terminis_proces_i_regles_operatives\"><\/span>Terminis, proc\u00e9s i regles operatives<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Presentaci\u00f3 de sol\u00b7licituds:<\/strong> des del 9 de juliol de 2026 fins al 28 de febrer de 2027 o fins a l&#8217;esgotament del pressupost. El pressupost no meritat en l&#8217;anualitat 2026 s&#8217;incorpora autom\u00e0ticament a l&#8217;anualitat 2027, respectant l&#8217;ordre d&#8217;entrada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Sistema d&#8217;adjudicaci\u00f3:<\/strong> rigor\u00f3s ordre d&#8217;entrada, sense concurr\u00e8ncia competitiva. No es puntuen m\u00e8rits ni es comparen projectes entre si. La celeritat en la presentaci\u00f3 telem\u00e0tica i l&#8217;abs\u00e8ncia d&#8217;errors documentals s\u00f3n determinants.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Terminis m\u00e0xims d&#8217;execuci\u00f3<\/strong> (comptats des de la notificaci\u00f3 de la proposta de resoluci\u00f3 provisional):<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Programa<\/th><th>Termini m\u00e0xim d&#8217;execuci\u00f3<\/th><\/tr><\/thead><tbody><tr><td>P1 \u00b7 Fotovoltaica \u2264 10 kWp<\/td><td>4 mesos<\/td><\/tr><tr><td>P1 \u00b7 Fotovoltaica 10-50 kWp<\/td><td>5 mesos<\/td><\/tr><tr><td>P1 \u00b7 Fotovoltaica 50-100 kWp<\/td><td>6 mesos<\/td><\/tr><tr><td>P1 \u00b7 Fotovoltaica &gt; 100 kWp<\/td><td>9 mesos<\/td><\/tr><tr><td>P2, P3 i P4 (aerot\u00e8rmia, bateries, punt de rec\u00e0rrega)<\/td><td>5 mesos<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Per a sol\u00b7licituds conjuntes que incorporin diversos programes, cada programa mant\u00e9 el seu propi termini, comptat des de la notificaci\u00f3 de la proposta de resoluci\u00f3 provisional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Regla dels tres pressupostos:<\/strong> obligat\u00f2ria si la despesa subvencionable supera els 40.000 euros (execuci\u00f3 d&#8217;obres) o els 15.000 euros (altres contractes). No \u00e9s obligatori incloure les tres ofertes a la sol\u00b7licitud inicial, per\u00f2 han d&#8217;estar disponibles per a inspecci\u00f3 posterior.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Limitaci\u00f3 per CUPS o empla\u00e7ament:<\/strong> nom\u00e9s \u00e9s subvencionable una instal\u00b7laci\u00f3 per punt de subministrament (CUPS) o per empla\u00e7ament. En autoconsum col\u00b7lectiu es poden presentar diverses instal\u00b7lacions si cadascuna t\u00e9 el seu CUPS de generaci\u00f3 neta independent.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Preguntes_frequents_sobre_la_tramitacio\"><\/span>Preguntes freq\u00fcents sobre la tramitaci\u00f3<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A SolarTradex gestionem ajuts a Balears des de fa anys. Aquestes s\u00f3n les preguntes que ens arriben una vegada i una altra sobre la Convocat\u00f2ria Factor Insularitat 2026-2027:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Com_a_particular_puc_demanar_Factor_Insularitat_per_installar_plaques_solars_a_casa\"><\/span>Com a particular, puc demanar Factor Insularitat per instal\u00b7lar plaques solars a casa?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>No per a la part fotovoltaica<\/strong>, per\u00f2 aix\u00f2 no significa que et quedis sense ajut. El Programa 1 exclou les persones f\u00edsiques sense activitat econ\u00f2mica, per\u00f2 la deducci\u00f3 estatal de l&#8217;IRPF derivada del RDL 7\/2026 cobreix precisament aquest sup\u00f2sit i permet recuperar una part molt significativa de la inversi\u00f3. Quan l&#8217;obra combina fotovoltaica amb electrificaci\u00f3 t\u00e8rmica (aerot\u00e8rmia) en habitatge unifamiliar, el tram alt del 60% d&#8217;IRPF fa que el retorn fiscal net sigui pr\u00e0cticament equivalent al que obtindries combinant subvenci\u00f3 m\u00e9s IRPF residual. I s\u00ed que pots accedir al Programa 3 de Factor Insularitat si instal\u00b7les una bateria, i al Programa 4 si instal\u00b7les un punt de rec\u00e0rrega de vehicle el\u00e8ctric. En conjunt, la combinaci\u00f3 IRPF estatal + Factor (bateries i VE) cobreix bona part de la inversi\u00f3 residencial.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Puc_presentar_un_projecte_conjunt_de_fotovoltaica_bateria_sent_particular\"><\/span>Puc presentar un projecte conjunt de fotovoltaica + bateria sent particular?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">S\u00ed. Al mateix expedient pots sol\u00b7licitar \u00fanicament el Programa 3 (bateria), desglossant a la sol\u00b7licitud les partides exclusivament corresponents a la bateria, extretes del pressupost conjunt. A la fase de justificaci\u00f3 s&#8217;aportar\u00e0 el n\u00famero d&#8217;expedient de registre conjunt de la instal\u00b7laci\u00f3 completa.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Puc_comencar_lobra_abans_de_tenir_la_resolucio_concedida\"><\/span>Puc comen\u00e7ar l&#8217;obra abans de tenir la resoluci\u00f3 concedida?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Els projectes acollits al r\u00e8gim general no poden iniciar-se abans de la data oficial de presentaci\u00f3 de la sol\u00b7licitud. Els projectes acollits al r\u00e8gim de minimis poden acollir-se a actuacions iniciades des de l&#8217;1 de gener de 2026. En qualsevol cas, conv\u00e9 consultar abans de facturar res.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Quant_dajut_rebo_si_tinc_una_empresa_i_maculli_a_minimis\"><\/span>Quant d&#8217;ajut rebo si tinc una empresa i m&#8217;aculli a minimis?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Si ets una empresa que pot optar al r\u00e8gim de minimis i no has esgotat el topall acumulat de 300.000 euros en els \u00faltims tres exercicis fiscals, accedeixes a les intensitats m\u00e9s altes: 70% en fotovoltaica, aerot\u00e8rmia i punt de rec\u00e0rrega, i 45% en bateries. Aquestes intensitats s&#8217;apliquen sobre el cost subvencionable (que pot ser inferior al cost real del projecte), no sobre l&#8217;import total facturat.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Les_grans_empreses_poden_acollir-se_al_minimis\"><\/span>Les grans empreses poden acollir-se al minimis?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">S\u00ed. El Govern balear ha confirmat a les FAQ oficials que qualsevol empresa, incloses les grans, pot optar expressament pel r\u00e8gim de minimis, amb les intensitats corresponents a aquesta columna.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Puc_installar_un_carregador_de_vehicle_electric_de_22_kW_i_acollir-me_a_lajut\"><\/span>Puc instal\u00b7lar un carregador de vehicle el\u00e8ctric de 22 kW i acollir-me a l&#8217;ajut?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">S\u00ed, per\u00f2 amb condici\u00f3. La convocat\u00f2ria limita a 15 kW. Els equips trif\u00e0sics habituals es poden instal\u00b7lar configurats i limitats a 15 kW o menys mitjan\u00e7ant les proteccions el\u00e8ctriques corresponents, amb la limitaci\u00f3 reflectida en el certificat d&#8217;instal\u00b7laci\u00f3 i en la documentaci\u00f3 de legalitzaci\u00f3. La mem\u00f2ria t\u00e8cnica i la declaraci\u00f3 responsable de l&#8217;instal\u00b7lador han d&#8217;acreditar aquesta limitaci\u00f3.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Existeix_una_ratio_maxima_entre_la_capacitat_de_bateria_i_la_potencia_de_la_installacio_fotovoltaica\"><\/span>Existeix una r\u00e0tio m\u00e0xima entre la capacitat de bateria i la pot\u00e8ncia de la instal\u00b7laci\u00f3 fotovoltaica?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>No.<\/strong> En aquesta convocat\u00f2ria no s&#8217;aplica cap r\u00e0tio m\u00e0xim kWh\/kWp. Es pot dimensionar la bateria amb criteri t\u00e8cnic i comercial, respectant \u00fanicament el l\u00edmit de 200 kWh de capacitat total subvencionable.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Que_passa_si_sesgoten_els_fons_de_2026_abans_de_resoldre_el_meu_expedient\"><\/span>Qu\u00e8 passa si s&#8217;esgoten els fons de 2026 abans de resoldre el meu expedient?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El pressupost no meritat en l&#8217;anualitat 2026 s&#8217;incorpora autom\u00e0ticament a l&#8217;anualitat 2027, respectant l&#8217;ordre d&#8217;entrada. \u00c9s a dir, un expedient presentat el 2026 que no arribi a resoldre&#8217;s per esgotament del cr\u00e8dit de l&#8217;exercici passa a l&#8217;anualitat seg\u00fcent sense perdre posici\u00f3.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Puc_combinar_Factor_Insularitat_amb_la_deduccio_de_lIRPF_sobre_la_mateixa_obra\"><\/span>Puc combinar Factor Insularitat amb la deducci\u00f3 de l&#8217;IRPF sobre la mateixa obra?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">S\u00ed, per\u00f2 l&#8217;import subvencionat es descompta de la base dedu\u00efble a l&#8217;IRPF i tributa a m\u00e9s com a guany patrimonial. La deducci\u00f3 s&#8217;aplica exclusivament sobre la part de la despesa efectivament satisfeta pel contribuent, neta de la subvenci\u00f3 rebuda.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Com_a_empresa_em_conve_combinar_Factor_amb_la_llibertat_damortitzacio_de_lImpost_sobre_Societats\"><\/span>Com a empresa, em conv\u00e9 combinar Factor amb la llibertat d&#8217;amortitzaci\u00f3 de l&#8217;Impost sobre Societats?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">En la majoria de casos, s\u00ed. La subvenci\u00f3 redueix el cost inicial i la llibertat d&#8217;amortitzaci\u00f3 avan\u00e7a el retorn fiscal sobre la part no subvencionada. Combinats correctament, acceleren de forma substancial la TIR del projecte. La combinaci\u00f3 \u00f2ptima per a cada cas concret conv\u00e9 revisar-la amb l&#8217;assessor fiscal.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Les_bonificacions_municipals_Calvia_Palma_es_demanen_amb_Factor_Insularitat\"><\/span>Les bonificacions municipals (Calvi\u00e0, Palma) es demanen amb Factor Insularitat?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>No.<\/strong> S\u00f3n tr\u00e0mits independents amb la seva pr\u00f2pia ordenan\u00e7a municipal i el seu propi calendari. A Calvi\u00e0, per exemple, la bonificaci\u00f3 de l&#8217;IBI s&#8217;ha de sol\u00b7licitar entre agost i octubre de l&#8217;any anterior a l&#8217;exercici d&#8217;aplicaci\u00f3; passar la finestra significa perdre un any.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Consideracio_final\"><\/span>Consideraci\u00f3 final<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">La Convocat\u00f2ria Factor Insularitat 2026-2027 \u00e9s, avui per avui, la l\u00ednia d&#8217;ajuts balear amb major abast vigent. Amb un termini fins a finals de febrer de 2027, quatre programes complementaris i intensitats competitives per a tots els perfils de beneficiari excepte per a les persones f\u00edsiques sense activitat econ\u00f2mica en fotovoltaica, permet acometre inversions en autoconsum, electrificaci\u00f3 t\u00e8rmica, emmagatzematge i mobilitat el\u00e8ctrica amb un retorn econ\u00f2mic significatiu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Per al particular resident a Balears el 2026 amb habitatge unifamiliar o pis, la via practicable en fotovoltaica passa avui per la deducci\u00f3 estatal de l&#8217;IRPF (RDL 7\/2026) mentre no es reobri FOTOPAR, amb la reserva que l&#8217;aplicaci\u00f3 fiscal concreta al cas balear s&#8217;ha de revisar amb assessor. Per a la part de bateria i de punt de rec\u00e0rrega, per\u00f2, s\u00ed que pot acudir a la Convocat\u00f2ria Factor Insularitat amb intensitats del 45% i del 70% respectivament.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Per a l&#8217;empresa balear, Factor Insularitat \u00e9s la l\u00ednia principal, amb intensitats del 40% al 70% segons r\u00e8gim i mida. Combinada amb la llibertat d&#8217;amortitzaci\u00f3 de l&#8217;Impost sobre Societats del RDL 7\/2026 i, quan apliqui, amb la valoritzaci\u00f3 de CAE, ofereix un marc financer dif\u00edcil de repetir en altres territoris de l&#8217;Estat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Per al sector hoteler, la combinaci\u00f3 Factor + ITS \u2014cadascun per a les actuacions que li s\u00f3n pr\u00f2pies\u2014 \u00e9s el cam\u00ed operatiu natural, respectant la regla de no doble finan\u00e7ament.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Un darrer apunt de context operatiu. La l\u00f2gica de rigor\u00f3s ordre d&#8217;entrada que governa Factor Insularitat premia l&#8217;anticipaci\u00f3 en la presentaci\u00f3 telem\u00e0tica. Per\u00f2 anticipar-se sense projecte t\u00e8cnic ben tancat \u00e9s font de minoracions posteriors. La combinaci\u00f3 \u00f2ptima \u2014projecte t\u00e8cnic rigor\u00f3s + presentaci\u00f3 el primer dia h\u00e0bil disponible\u2014 \u00e9s la que maximitza tant la probabilitat d&#8217;obtenir l&#8217;ajut com la certesa de cobrar-lo \u00edntegrament al final del proc\u00e9s.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Si est\u00e0s valorant una inversi\u00f3 en autoconsum, aerot\u00e8rmia, bateries o punt de rec\u00e0rrega a qualsevol de les illes i vols una oferta t\u00e8cnica adaptada al teu cas, pots <a href=\"https:\/\/solartradex.com\/ca\/sollicitar-pressupost\/plaques-solars\">sol\u00b7licitar-nos una oferta sense comprom\u00eds<\/a> o consultar els <a href=\"https:\/\/solartradex.com\/ca\/ajuts-subvencions\">ajuts actualment vigents<\/a>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><em><strong>Nota:<\/strong> La descripci\u00f3 del marc d&#8217;ajuts continguda en aquest article es basa en la Resoluci\u00f3 6663 publicada al BOIB n\u00fam. 83 de 2 de juliol de 2026 (Convocat\u00f2ria Factor Insularitat 2026-2027) i en les preguntes freq\u00fcents publicades pel Govern balear sobre aquesta convocat\u00f2ria. L&#8217;estat real de cada convocat\u00f2ria (fons disponibles, terminis, requisits espec\u00edfics) pot haver variat des de la publicaci\u00f3 d&#8217;aquest article; conv\u00e9 verificar l&#8217;estat actual a les fonts oficials del Govern balear abans d&#8217;iniciar qualsevol tramitaci\u00f3. Aquest article no substitueix l&#8217;assessorament professional espec\u00edfic per a cada situaci\u00f3.<\/em><\/p>\n\n\n<\/p>\n<p><\/p><script type=\"application\/ld+json\">{\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"L'excepci\u00f3 balear: per qu\u00e8 existeix un marc d'ajuts espec\u00edfic\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"A SolarTradex, amb oficina a Palma, sabem que les Illes Balears operen sota condicions energ\u00e8tiques diferents de la resta de l'Estat. La insularitat no \u00e9s una etiqueta administrativa: \u00e9s una realitat f\u00edsica que es tradueix en cables submarins amb capacitat limitada, cicles combinats de gas cobrint la punta de demanda a l'estiu, preus majoristes hist\u00f2ricament per sobre de la mitjana peninsular, i una vulnerabilitat estructural davant de qualsevol tensi\u00f3 geopol\u00edtica que afecti el subministrament de combustibles f\u00f2ssils importats.Aquesta condici\u00f3 justifica l'exist\u00e8ncia d'un ecosistema d'ajuts espec\u00edficament dissenyat per accelerar la transici\u00f3 energ\u00e8tica de l'arxip\u00e8lag. El 2026-2027 hi conviuen diversos instruments amb or\u00edgens i destinataris diferents: la Convocat\u00f2ria Factor Insularitat 2026-2027 finan\u00e7ada amb fons auton\u00f2mics propis, la l\u00ednia FOTOPAR per a autoconsum residencial (actualment amb fons esgotats), el marc PITEIB lligat a Next Generation EU, i els ajuts de l'Impost del Turisme Sostenible per al sector allotjatiu. Entendre quin instrument s'aplica a cada perfil i en quin estat es troba cada convocat\u00f2ria \u00e9s la primera condici\u00f3 per no perdre temps ni oportunitats.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"L'apagada peninsular de 2025 i per qu\u00e8 Balears no es va apagar\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Per entendre per qu\u00e8 el marc actual prioritza tan agressivament l'emmagatzematge energ\u00e8tic, conv\u00e9 recordar qu\u00e8 va passar el dilluns 28 d'abril de 2025 a les 12:33 hores. En un interval d'amb prou feines cinc segons, el sistema el\u00e8ctric peninsular va perdre 15.000 MW de pot\u00e8ncia \u2014el 60% de la producci\u00f3 nacional\u2014 per una cadena de sobretensions i oscil\u00b7lacions de freq\u00fc\u00e8ncia que Red El\u00e9ctrica no va poder contenir. El resultat va ser una apagada sist\u00e8mica que va deixar sense subministrament 50 milions de persones a Espanya, Portugal i Andorra.Les Illes Balears, tanmateix, no es van apagar. En el segon exacte del col\u00b7lapse, l'interconnector pen\u00ednsula-Mallorca (l'enlla\u00e7 Comanxe) es va desconnectar autom\u00e0ticament per protocol de seguretat. Balears \u2014el mix del qual cobreix aproximadament el 93% de la demanda amb generaci\u00f3 pr\u00f2pia\u2014 va absorbir la c\u00e0rrega amb les centrals d'Es Murterar (Mallorca), Cas Tresorer i Son Reus (Palma), estabilitzant la freq\u00fc\u00e8ncia de la xarxa insular. Mallorca, Menorca, Eivissa i Formentera van operar com un sistema tancat i estable durant tota la crisi peninsular.Per\u00f2 va apar\u00e8ixer una vulnerabilitat cr\u00edtica sis hores despr\u00e9s: a les 18:06h del mateix dilluns, amb el subministrament el\u00e8ctric plenament operatiu a l'arxip\u00e8lag, la xarxa de fibra \u00f2ptica va caure per esgotament dels SAI\/UPS dels nusos peninsulars. La telefonia m\u00f2bil va patir fallades intermitents fins a les 07:00 del dimarts; els dat\u00e0fons i la banca electr\u00f2nica no es van recuperar fins al dimecres; el servei d'emerg\u00e8ncies 061 va quedar inoperatiu. El Govern va activar el Pla Territorial d'Emerg\u00e8ncies PLATERBAL a nivell 1.La lli\u00e7\u00f3 estrat\u00e8gica que van treure les administracions balears va ser clara: la sobirania el\u00e8ctrica no \u00e9s suficient si els nusos cr\u00edtics depenen de sistemes de suport amb autonomies d'hores. Aquesta an\u00e0lisi va ser el catalitzador directe de l'actual aposta auton\u00f2mica per l'emmagatzematge distribu\u00eft, materialitzada en el pes espec\u00edfic que les bateries tenen a la Convocat\u00f2ria Factor Insularitat 2026-2027.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Factor Insularitat 2026-2027, FOTOPAR i PITEIB: qu\u00e8 \u00e9s cada cosa i per qu\u00e8 es confonen\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Un dels punts que m\u00e9s confusi\u00f3 genera a Balears \u00e9s la coexist\u00e8ncia de diversos instruments d'ajut que a vegades se citen indistintament. Conv\u00e9 delimitar-los clarament perqu\u00e8 tenen or\u00edgens, destinataris i estats diferents:Convocat\u00f2ria Factor Insularitat 2026-2027. \u00c9s la convocat\u00f2ria auton\u00f2mica actualment oberta, publicada mitjan\u00e7ant Resoluci\u00f3 al BOIB n\u00fam. 83 de 2 de juliol de 2026 i amb termini de presentaci\u00f3 des del 9 de juliol de 2026 fins al 28 de febrer de 2027 (o fins a l'esgotament del pressupost). Est\u00e0 finan\u00e7ada amb fons auton\u00f2mics propis del r\u00e8gim de compensaci\u00f3 per insularitat, no amb fons europeus Next Generation. Cobreix quatre programes diferents que analitzem m\u00e9s avall.FOTOPAR. \u00c9s una convocat\u00f2ria auton\u00f2mica diferent i independent, cofinan\u00e7ada per fons FEDER i regulada a l'empara del Reial Decret 477\/2021, orientada espec\u00edficament a l'autoconsum fotovoltaic residencial (persones f\u00edsiques). En aquest moment es troba amb fons esgotats i no admet noves sol\u00b7licituds. \u00c9s la l\u00ednia que tradicionalment molts particulars recorden pel nom perqu\u00e8 ha estat durant anys el vehicle natural per als ajuts residencials de plaques solars a Balears.PITEIB (Pla d'Inversions per a la Transici\u00f3 Energ\u00e8tica de les Illes Balears). \u00c9s un pla estrat\u00e8gic m\u00e9s ampli del Govern balear, canalitzat principalment amb fons Next Generation EU. No \u00e9s una convocat\u00f2ria d'ajuts en si mateix, sin\u00f3 un marc que agrupa diverses l\u00ednies de finan\u00e7ament orientades a la transici\u00f3 energ\u00e8tica. Conviu amb Factor Insularitat per\u00f2 no la inclou ni la substitueix.Ajuts de l'Impost del Turisme Sostenible (ITS). Finan\u00e7ats amb la recaptaci\u00f3 de l'ITS, estan dirigits espec\u00edficament al sector allotjatiu balear amb una dotaci\u00f3 de 5.000.000 d'euros el 2026 (3M\u20ac per a efici\u00e8ncia i 2M\u20ac per a innovaci\u00f3). No cobreixen instal\u00b7lacions fotovoltaiques ni e\u00f2liques, per la qual cosa un hotel que vulgui abordar de forma integral la seva descarbonitzaci\u00f3 ha de combinar ITS amb Factor Insularitat, respectant la regla de no doble finan\u00e7ament.En aquest article ens centrem en la Convocat\u00f2ria Factor Insularitat 2026-2027, per ser la l\u00ednia vigent ara mateix amb major abast i versatilitat.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Els quatre programes de la Convocat\u00f2ria Factor Insularitat\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"La convocat\u00f2ria s'estructura en quatre programes independents que es poden sol\u00b7licitar per separat o de forma conjunta en una mateixa sol\u00b7licitud:Programa 1 \u00b7 Autoconsum el\u00e8ctric (fotovoltaic). Cobreix instal\u00b7lacions fotovoltaiques d'autoconsum fins a 500 kWp. Aquest programa NO admet persones f\u00edsiques sense activitat econ\u00f2mica com a benefici\u00e0ries. \u00c9s el punt diferencial m\u00e9s important per al segment residencial, i el desenvolupem a l'apartat seg\u00fcent.Programa 2 \u00b7 Generaci\u00f3 t\u00e8rmica renovable. Cobreix instal\u00b7lacions d'aerot\u00e8rmia. Exclou expressament la tecnologia aire-aire per a tots els sectors (residencial, terciari i industrial). Cobreix la generaci\u00f3 t\u00e8rmica en \u20ac\/kWt i tamb\u00e9 els nous sistemes de distribuci\u00f3 associats.Programa 3 \u00b7 Emmagatzematge el\u00e8ctric per a autoconsum. Cobreix bateries d'acumulaci\u00f3 associades a l'autoconsum, fins a 200 kWh de capacitat. Un detall rellevant confirmat a les FAQ oficials: en aquesta convocat\u00f2ria no s'aplica r\u00e0tio m\u00e0xim kWh\/kWp entre la capacitat de la bateria i la pot\u00e8ncia de generaci\u00f3 associada. I un altre detall clau per a particulars: encara que estiguin exclosos del Programa 1 (fotovoltaica), s\u00ed que poden accedir al Programa 3 (bateries) presentant la sol\u00b7licitud amb les partides corresponents desglossades.Programa 4 \u00b7 Infraestructura de rec\u00e0rrega privada de vehicle el\u00e8ctric. Cobreix nous punts de rec\u00e0rrega privats fins a 15 kW. Els equips trif\u00e0sics habituals de 22 kW poden ser elegibles si es configuren, limiten i instal\u00b7len efectivament a 15 kW o menys, amb la limitaci\u00f3 reflectida en les proteccions i en la mem\u00f2ria t\u00e8cnica.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Qui pot demanar qu\u00e8: el repartiment per perfil de beneficiari\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Aquest \u00e9s el punt que m\u00e9s malentesos genera a les consultes comercials. La convocat\u00f2ria distingeix clarament entre perfils, i no tots poden accedir a tots els programes:Persones f\u00edsiques SENSE activitat econ\u00f2mica (residents a Illes Balears):Programa 1 (fotovoltaica): NO elegibles.Programa 2 (aerot\u00e8rmia): s\u00ed, ajut del 70%.Programa 3 (bateries): s\u00ed, ajut del 45%.Programa 4 (punt de rec\u00e0rrega): s\u00ed, ajut del 70% amb l\u00edmit de 2.500 \u20ac per instal\u00b7laci\u00f3.Un particular que vulgui instal\u00b7lar plaques solars al seu habitatge no pot sol\u00b7licitar la Convocat\u00f2ria Factor Insularitat per a la part fotovoltaica. En un primer moment aix\u00f2 pot semblar un obstacle important, per\u00f2 a la pr\u00e0ctica no ho \u00e9s tant: la deducci\u00f3 estatal de l'IRPF derivada del RDL 7\/2026 permet recuperar una part molt significativa de la inversi\u00f3, especialment quan es combina fotovoltaica amb electrificaci\u00f3 t\u00e8rmica (aerot\u00e8rmia), on el tram alt del 60% en habitatge unifamiliar fa que el retorn fiscal net sigui pr\u00e0cticament equivalent al que s'obtindria combinant subvenci\u00f3 m\u00e9s IRPF residual. A m\u00e9s, si el particular combina FV amb bateria, la part de la bateria s\u00ed que es pot acollir al Programa 3 de Factor Insularitat amb les partides desglossades en la sol\u00b7licitud, i la part del punt de rec\u00e0rrega al Programa 4 si tamb\u00e9 s'hi inclou. A la pr\u00e0ctica, el particular balear disposa d'un ventall d'instruments que, combinats correctament, cobreixen bona part de la inversi\u00f3.Persones f\u00edsiques AMB activitat econ\u00f2mica (aut\u00f2noms): s\u00f3n elegibles en els quatre programes, amb les intensitats corresponents al r\u00e8gim que apliquin.Empreses i entitats (pimes, grans empreses, comunitats de propietaris, comunitats energ\u00e8tiques, entitats sense \u00e0nim de lucre, administracions locals): elegibles en els quatre programes, amb intensitat variable segons r\u00e8gim (Minimis o Reglament General d'Exempci\u00f3 per Categories) i mida.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Intensitats d'ajut i costos m\u00e0xims subvencionables\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Les intensitats varien segons el r\u00e8gim d'ajut al qual s'aculli el beneficiari. Tota empresa \u2014incloses les grans empreses, segons ha confirmat el Govern a les FAQ oficials\u2014 pot optar per acollir-se al r\u00e8gim de minimis, amb les intensitats m\u00e9s altes, sempre que no hagi esgotat el topall acumulat de 300.000 euros en tres exercicis fiscals.Intensitats per r\u00e8gim i mida de beneficiari:Actuaci\u00f3Minimis \/ Particular sense activitatPetita empresa (RGEC)Mitjana empresa (RGEC)Gran empresa (RGEC)Fotovoltaica (P1)70%60%50%40%Aerot\u00e8rmia (P2)70%60%50%40%Bateries (P3)45%40%35%30%Punt de rec\u00e0rrega (P4)70%40%30%20%Aquestes intensitats no s'apliquen sobre el cost real de la instal\u00b7laci\u00f3, sin\u00f3 sobre el cost subvencionable que fixa la convocat\u00f2ria en funci\u00f3 de la tecnologia i el tram. En cada cas, es pren el menor valor entre el cost real i el cost m\u00e0xim subvencionable, i sobre aquest menor s'aplica el percentatge.Costos m\u00e0xims subvencionables \u00b7 Fotovoltaica (Programa 1):Tram de pot\u00e8nciaCost m\u00e0x. generaci\u00f3Complement marquesinaComplement retirada amiantComplement canvi tensi\u00f3P \u2264 10 kWp1.188 \u20ac\/kWp500 \u20ac\/kWp1.082 \u20ac\/kWp400 \u20ac\/kWp10 &lt; P \u2264 100 kWp910 \u20ac\/kWp500 \u20ac\/kWp817 \u20ac\/kWp300 \u20ac\/kWp100 &lt; P \u2264 500 kWp749 \u20ac\/kWp500 \u20ac\/kWp720 \u20ac\/kWp200 \u20ac\/kWpEl c\u00e0lcul del cost unitari m\u00e0xim de generaci\u00f3 es fa per trams acumulatius des de l'escal\u00f3 inferior. Els complements (marquesina, retirada d'amiant, canvi de tensi\u00f3) no apliquen efecte acumulatiu.Costos m\u00e0xims subvencionables \u00b7 Aerot\u00e8rmia (Programa 2):Cost unitari m\u00e0xim t\u00e8rmic: 1.000 \u20ac\/kWtNous sistemes de distribuci\u00f3: 450 \u20ac\/kWt addicionalsL\u00edmit d'ajut per a persones f\u00edsiques i aut\u00f2noms: 25.000 \u20acL\u00edmit d'ajut per a la resta de beneficiaris: 100.000 \u20acCostos m\u00e0xims subvencionables \u00b7 Bateries (Programa 3):CapacitatCost m\u00e0xim subvencionable\u2264 10 kWh910 \u20ac\/kWh10 &lt; capacitat \u2264 100 kWh650 \u20ac\/kWh100 &lt; capacitat \u2264 200 kWh455 \u20ac\/kWhCostos m\u00e0xims subvencionables \u00b7 Punt de rec\u00e0rrega (Programa 4):No existeix cost m\u00e0xim \u20ac\/kW.L\u00edmit d'ajut: 12.000 \u20ac per instal\u00b7laci\u00f3 per a empreses i entitats.L\u00edmit d'ajut: 2.500 \u20ac per instal\u00b7laci\u00f3 per a particulars sense activitat econ\u00f2mica.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Compatibilitats amb altres instruments fiscals\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"&#x1f4cc; DISCLAIMER FISCAL BALEARS \u00b7 Actualitzaci\u00f3 pendentL'articulaci\u00f3 espec\u00edfica entre la Convocat\u00f2ria Factor Insularitat, el tram auton\u00f2mic de l'IRPF balear i el r\u00e8gim estatal de deduccions del RDL 7\/2026 est\u00e0 pendent de confirmaci\u00f3 per part del nostre assessor fiscal. Aquest apartat descriu el marc general de compatibilitats vigent, per\u00f2 les quanties concretes i la interacci\u00f3 exacta entre instruments per al cas d'un resident a Balears s'han de verificar sempre amb un professional. Actualitzarem aquesta secci\u00f3 tan bon punt disposem de la confirmaci\u00f3 t\u00e8cnica.La Convocat\u00f2ria Factor Insularitat 2026-2027 \u00e9s compatible amb diversos instruments fiscals complementaris, sempre respectant la regla de no doble finan\u00e7ament sobre el mateix cost:Deducci\u00f3 IRPF (RDL 7\/2026). Compatible amb Factor Insularitat. L'import subvencionat es descompta de la base dedu\u00efble a l'IRPF i a m\u00e9s tributa com a guany patrimonial. La deducci\u00f3 s'aplica exclusivament sobre la part de la despesa efectivament satisfeta pel contribuent, neta de la subvenci\u00f3 rebuda. Els trams aplicables i la possible interacci\u00f3 amb el tram auton\u00f2mic balear a l'IRPF s'han de consultar amb un assessor fiscal.Llibertat d'amortitzaci\u00f3 de l'Impost sobre Societats (RDL 7\/2026, art. 37). Compatible amb Factor Insularitat per a empreses. La subvenci\u00f3 redueix el cost inicial de la inversi\u00f3, i la llibertat d'amortitzaci\u00f3 avan\u00e7a el retorn fiscal sobre la part no subvencionada, permetent amortitzar el 100% de l'actiu en el mateix exercici d'entrada en funcionament.Certificats d'Estalvi Energ\u00e8tic (CAE). Compatibles amb Factor Insularitat. Especialment rellevants per a la substituci\u00f3 de calderes f\u00f2ssils per aerot\u00e8rmia, on el RDL 7\/2026 refor\u00e7a els coeficients multiplicadors.Bonificacions municipals en IBI i ICIO. Compatibles. A Calvi\u00e0, bonificaci\u00f3 del 50% en IBI i 95% en ICIO per a instal\u00b7lacions que integrin aprofitament renovable (sol\u00b7licitud de l'IBI entre agost i octubre de l'any anterior). A Palma, bonificacions de fins al 95% en ICIO per a instal\u00b7lacions no obligat\u00f2ries per llei. Cada ajuntament t\u00e9 la seva pr\u00f2pia ordenan\u00e7a i calendari.Next Generation (estatals). Requereix verificaci\u00f3 en cada convocat\u00f2ria: \u00e9s freq\u00fcent la incompatibilitat sobre el mateix cost.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Terminis, proc\u00e9s i regles operatives\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Presentaci\u00f3 de sol\u00b7licituds: des del 9 de juliol de 2026 fins al 28 de febrer de 2027 o fins a l'esgotament del pressupost. El pressupost no meritat en l'anualitat 2026 s'incorpora autom\u00e0ticament a l'anualitat 2027, respectant l'ordre d'entrada.Sistema d'adjudicaci\u00f3: rigor\u00f3s ordre d'entrada, sense concurr\u00e8ncia competitiva. No es puntuen m\u00e8rits ni es comparen projectes entre si. La celeritat en la presentaci\u00f3 telem\u00e0tica i l'abs\u00e8ncia d'errors documentals s\u00f3n determinants.Terminis m\u00e0xims d'execuci\u00f3 (comptats des de la notificaci\u00f3 de la proposta de resoluci\u00f3 provisional):ProgramaTermini m\u00e0xim d'execuci\u00f3P1 \u00b7 Fotovoltaica \u2264 10 kWp4 mesosP1 \u00b7 Fotovoltaica 10-50 kWp5 mesosP1 \u00b7 Fotovoltaica 50-100 kWp6 mesosP1 \u00b7 Fotovoltaica &gt; 100 kWp9 mesosP2, P3 i P4 (aerot\u00e8rmia, bateries, punt de rec\u00e0rrega)5 mesosPer a sol\u00b7licituds conjuntes que incorporin diversos programes, cada programa mant\u00e9 el seu propi termini, comptat des de la notificaci\u00f3 de la proposta de resoluci\u00f3 provisional.Regla dels tres pressupostos: obligat\u00f2ria si la despesa subvencionable supera els 40.000 euros (execuci\u00f3 d'obres) o els 15.000 euros (altres contractes). No \u00e9s obligatori incloure les tres ofertes a la sol\u00b7licitud inicial, per\u00f2 han d'estar disponibles per a inspecci\u00f3 posterior.Limitaci\u00f3 per CUPS o empla\u00e7ament: nom\u00e9s \u00e9s subvencionable una instal\u00b7laci\u00f3 per punt de subministrament (CUPS) o per empla\u00e7ament. En autoconsum col\u00b7lectiu es poden presentar diverses instal\u00b7lacions si cadascuna t\u00e9 el seu CUPS de generaci\u00f3 neta independent.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Preguntes freq\u00fcents sobre la tramitaci\u00f3\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"A SolarTradex gestionem ajuts a Balears des de fa anys. Aquestes s\u00f3n les preguntes que ens arriben una vegada i una altra sobre la Convocat\u00f2ria Factor Insularitat 2026-2027:\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Com a particular, puc demanar Factor Insularitat per instal\u00b7lar plaques solars a casa?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"No per a la part fotovoltaica, per\u00f2 aix\u00f2 no significa que et quedis sense ajut. El Programa 1 exclou les persones f\u00edsiques sense activitat econ\u00f2mica, per\u00f2 la deducci\u00f3 estatal de l'IRPF derivada del RDL 7\/2026 cobreix precisament aquest sup\u00f2sit i permet recuperar una part molt significativa de la inversi\u00f3. Quan l'obra combina fotovoltaica amb electrificaci\u00f3 t\u00e8rmica (aerot\u00e8rmia) en habitatge unifamiliar, el tram alt del 60% d'IRPF fa que el retorn fiscal net sigui pr\u00e0cticament equivalent al que obtindries combinant subvenci\u00f3 m\u00e9s IRPF residual. I s\u00ed que pots accedir al Programa 3 de Factor Insularitat si instal\u00b7les una bateria, i al Programa 4 si instal\u00b7les un punt de rec\u00e0rrega de vehicle el\u00e8ctric. En conjunt, la combinaci\u00f3 IRPF estatal + Factor (bateries i VE) cobreix bona part de la inversi\u00f3 residencial.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Puc presentar un projecte conjunt de fotovoltaica + bateria sent particular?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"S\u00ed. Al mateix expedient pots sol\u00b7licitar \u00fanicament el Programa 3 (bateria), desglossant a la sol\u00b7licitud les partides exclusivament corresponents a la bateria, extretes del pressupost conjunt. A la fase de justificaci\u00f3 s'aportar\u00e0 el n\u00famero d'expedient de registre conjunt de la instal\u00b7laci\u00f3 completa.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Puc comen\u00e7ar l'obra abans de tenir la resoluci\u00f3 concedida?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Els projectes acollits al r\u00e8gim general no poden iniciar-se abans de la data oficial de presentaci\u00f3 de la sol\u00b7licitud. Els projectes acollits al r\u00e8gim de minimis poden acollir-se a actuacions iniciades des de l'1 de gener de 2026. En qualsevol cas, conv\u00e9 consultar abans de facturar res.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Quant d'ajut rebo si tinc una empresa i m'aculli a minimis?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Si ets una empresa que pot optar al r\u00e8gim de minimis i no has esgotat el topall acumulat de 300.000 euros en els \u00faltims tres exercicis fiscals, accedeixes a les intensitats m\u00e9s altes: 70% en fotovoltaica, aerot\u00e8rmia i punt de rec\u00e0rrega, i 45% en bateries. Aquestes intensitats s'apliquen sobre el cost subvencionable (que pot ser inferior al cost real del projecte), no sobre l'import total facturat.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Les grans empreses poden acollir-se al minimis?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"S\u00ed. El Govern balear ha confirmat a les FAQ oficials que qualsevol empresa, incloses les grans, pot optar expressament pel r\u00e8gim de minimis, amb les intensitats corresponents a aquesta columna.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Puc instal\u00b7lar un carregador de vehicle el\u00e8ctric de 22 kW i acollir-me a l'ajut?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"S\u00ed, per\u00f2 amb condici\u00f3. La convocat\u00f2ria limita a 15 kW. Els equips trif\u00e0sics habituals es poden instal\u00b7lar configurats i limitats a 15 kW o menys mitjan\u00e7ant les proteccions el\u00e8ctriques corresponents, amb la limitaci\u00f3 reflectida en el certificat d'instal\u00b7laci\u00f3 i en la documentaci\u00f3 de legalitzaci\u00f3. La mem\u00f2ria t\u00e8cnica i la declaraci\u00f3 responsable de l'instal\u00b7lador han d'acreditar aquesta limitaci\u00f3.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Existeix una r\u00e0tio m\u00e0xima entre la capacitat de bateria i la pot\u00e8ncia de la instal\u00b7laci\u00f3 fotovoltaica?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"No. En aquesta convocat\u00f2ria no s'aplica cap r\u00e0tio m\u00e0xim kWh\/kWp. Es pot dimensionar la bateria amb criteri t\u00e8cnic i comercial, respectant \u00fanicament el l\u00edmit de 200 kWh de capacitat total subvencionable.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Qu\u00e8 passa si s'esgoten els fons de 2026 abans de resoldre el meu expedient?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"El pressupost no meritat en l'anualitat 2026 s'incorpora autom\u00e0ticament a l'anualitat 2027, respectant l'ordre d'entrada. \u00c9s a dir, un expedient presentat el 2026 que no arribi a resoldre's per esgotament del cr\u00e8dit de l'exercici passa a l'anualitat seg\u00fcent sense perdre posici\u00f3.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Puc combinar Factor Insularitat amb la deducci\u00f3 de l'IRPF sobre la mateixa obra?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"S\u00ed, per\u00f2 l'import subvencionat es descompta de la base dedu\u00efble a l'IRPF i tributa a m\u00e9s com a guany patrimonial. La deducci\u00f3 s'aplica exclusivament sobre la part de la despesa efectivament satisfeta pel contribuent, neta de la subvenci\u00f3 rebuda.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Com a empresa, em conv\u00e9 combinar Factor amb la llibertat d'amortitzaci\u00f3 de l'Impost sobre Societats?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"En la majoria de casos, s\u00ed. La subvenci\u00f3 redueix el cost inicial i la llibertat d'amortitzaci\u00f3 avan\u00e7a el retorn fiscal sobre la part no subvencionada. Combinats correctament, acceleren de forma substancial la TIR del projecte. La combinaci\u00f3 \u00f2ptima per a cada cas concret conv\u00e9 revisar-la amb l'assessor fiscal.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Les bonificacions municipals (Calvi\u00e0, Palma) es demanen amb Factor Insularitat?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"No. S\u00f3n tr\u00e0mits independents amb la seva pr\u00f2pia ordenan\u00e7a municipal i el seu propi calendari. A Calvi\u00e0, per exemple, la bonificaci\u00f3 de l'IBI s'ha de sol\u00b7licitar entre agost i octubre de l'any anterior a l'exercici d'aplicaci\u00f3; passar la finestra significa perdre un any.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Consideraci\u00f3 final\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"La Convocat\u00f2ria Factor Insularitat 2026-2027 \u00e9s, avui per avui, la l\u00ednia d'ajuts balear amb major abast vigent. Amb un termini fins a finals de febrer de 2027, quatre programes complementaris i intensitats competitives per a tots els perfils de beneficiari excepte per a les persones f\u00edsiques sense activitat econ\u00f2mica en fotovoltaica, permet acometre inversions en autoconsum, electrificaci\u00f3 t\u00e8rmica, emmagatzematge i mobilitat el\u00e8ctrica amb un retorn econ\u00f2mic significatiu.Per al particular resident a Balears el 2026 amb habitatge unifamiliar o pis, la via practicable en fotovoltaica passa avui per la deducci\u00f3 estatal de l'IRPF (RDL 7\/2026) mentre no es reobri FOTOPAR, amb la reserva que l'aplicaci\u00f3 fiscal concreta al cas balear s'ha de revisar amb assessor. Per a la part de bateria i de punt de rec\u00e0rrega, per\u00f2, s\u00ed que pot acudir a la Convocat\u00f2ria Factor Insularitat amb intensitats del 45% i del 70% respectivament.Per a l'empresa balear, Factor Insularitat \u00e9s la l\u00ednia principal, amb intensitats del 40% al 70% segons r\u00e8gim i mida. Combinada amb la llibertat d'amortitzaci\u00f3 de l'Impost sobre Societats del RDL 7\/2026 i, quan apliqui, amb la valoritzaci\u00f3 de CAE, ofereix un marc financer dif\u00edcil de repetir en altres territoris de l'Estat.Per al sector hoteler, la combinaci\u00f3 Factor + ITS \u2014cadascun per a les actuacions que li s\u00f3n pr\u00f2pies\u2014 \u00e9s el cam\u00ed operatiu natural, respectant la regla de no doble finan\u00e7ament.Un darrer apunt de context operatiu. La l\u00f2gica de rigor\u00f3s ordre d'entrada que governa Factor Insularitat premia l'anticipaci\u00f3 en la presentaci\u00f3 telem\u00e0tica. Per\u00f2 anticipar-se sense projecte t\u00e8cnic ben tancat \u00e9s font de minoracions posteriors. La combinaci\u00f3 \u00f2ptima \u2014projecte t\u00e8cnic rigor\u00f3s + presentaci\u00f3 el primer dia h\u00e0bil disponible\u2014 \u00e9s la que maximitza tant la probabilitat d'obtenir l'ajut com la certesa de cobrar-lo \u00edntegrament al final del proc\u00e9s.Si est\u00e0s valorant una inversi\u00f3 en autoconsum, aerot\u00e8rmia, bateries o punt de rec\u00e0rrega a qualsevol de les illes i vols una oferta t\u00e8cnica adaptada al teu cas, pots sol\u00b7licitar-nos una oferta sense comprom\u00eds o consultar els ajuts actualment vigents.Nota: La descripci\u00f3 del marc d'ajuts continguda en aquest article es basa en la Resoluci\u00f3 6663 publicada al BOIB n\u00fam. 83 de 2 de juliol de 2026 (Convocat\u00f2ria Factor Insularitat 2026-2027) i en les preguntes freq\u00fcents publicades pel Govern balear sobre aquesta convocat\u00f2ria. L'estat real de cada convocat\u00f2ria (fons disponibles, terminis, requisits espec\u00edfics) pot haver variat des de la publicaci\u00f3 d'aquest article; conv\u00e9 verificar l'estat actual a les fonts oficials del Govern balear abans d'iniciar qualsevol tramitaci\u00f3. Aquest article no substitueix l'assessorament professional espec\u00edfic per a cada situaci\u00f3.\"\n            }\n        }\n    ]\n}<\/script>\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;11967&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Valora este post&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Convocat\u00f2ria Factor Insularitat 2026-2027 a les Illes Balears: an\u00e0lisi dels quatre programes i sin\u00e8rgies fiscals.&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            <span class=\"kksr-muted\">Valora este post<\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>An\u00e0lisi de la Convocat\u00f2ria Factor Insularitat 2026-2027 a les Illes Balears: quatre programes (autoconsum, aerot\u00e8rmia, bateries fins 200 kWh, punts de rec\u00e0rrega), qui pot demanar qu\u00e8.<\/p>\n","protected":false},"author":412,"featured_media":11925,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_mbp_gutenberg_autopost":false,"footnotes":""},"categories":[119,224,123],"tags":[275,277,276,279,280],"class_list":["post-11967","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-estalvi-energetic","category-ajuts-i-subvencions","category-legislacio-energia-solar","tag-aerotermia-balears","tag-autoconsum-balears","tag-balears","tag-bateries","tag-factor-insularitat"],"fimg_url":"https:\/\/solartradex.com\/blog\/wp-content\/uploads\/2026\/07\/factor-insularidad-2026-2027-baleares-solartradex.jpg","post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/posts\/11967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/users\/412"}],"replies":[{"embeddable":true,"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/comments?post=11967"}],"version-history":[{"count":2,"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/posts\/11967\/revisions"}],"predecessor-version":[{"id":11980,"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/posts\/11967\/revisions\/11980"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/media\/11925"}],"wp:attachment":[{"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/media?parent=11967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/categories?post=11967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solartradex.com\/blog\/ca\/wp-json\/wp\/v2\/tags?post=11967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}